February 1, 2013

What?! Its February 1st!!

Ok, so what happened to January? Who stole the month of January? Ummm... with this rate, I may want to start on Christmas stuff now, as I may not realize that it's tomorrow...

So, Lets see, January, what did I do...

Well New Years was uneventful. Shawn played Boarderlands with Adam, via the internet, on the PS3, while I was thinking of changing where my blog was, how it looks and making my goals for 2013. A few days later a box arrived with my new Tunisian Crochet hooks!! I started a blanket for SILs foster baby with Lion Brands Pound of Love and the J hook. I had started a blanket for baby back in December after Christmas, but have changed my mind several times since then. I am going to stick with the Tunisian blanket.

Then came going back to work (which consisted of 1 day then the next few off... Strange schedule of mine, but it works. That weekend was my 31st BDay. Had a great time with Amy, Robert (Amy's Date), Adam, Shawn (DD) and me. Was sloshed on 3 shots and 4 mixed drinks, then we went to have breakfast and after dropping Amy and Robert off, we headed home. So, not such a bad start to the new year. (I had even cast on for a hat for myself as a BDay present).

Then after the epic BDay, which the next two days may have been a hangover may have been me getting sick, I had the flu. Crappy week of it. Was starting to feel better on the Friday, but stayed home from work to be rested and ready to go Monday. Come Sunday night/Monday morning I end up with vomit sick. So, there goes another week of feeling like crap and worse.

Not much crafting was done during the 2 weeks of sick, but I did start and finish a few projects. I didn't have much brain power so that limited what I worked on. Also didn't want to pass on the sick, so didn't work on projects for baby or the commission I have either. I finished my hat, a pair of fingerless gauntlets and a cowl during those two weeks. I didn't really feel like knitting most of the time, but was able to work on some personal and simple ribbing projects for myself.

Cowl, Hat and Fingerless gloves knitted for myself.
I finally get to go back to work the following week. Still not feeling so great, but I am sick of my bedroom and I need to get things done there. I had started another cowl (these are using up a present from MIL for Christmas 2012). I have finished that cowl, but I don't like it and I am going to frog it and find something else.

The weekend before I went back to work I went through my fingering weight tub and made sure they were all on Ravelry. This is part of wanting to have my stash up on Rav and to knit from it this year. I know there is more that is not up and I will go through the tubs a few at a time and see if I can get it all up there. This way I just have to search for patterns then see if I have some yarn for them to use.

Here is the yarn stash tubs. 
During the stash diving/picture taking, I found some projects that are not finished. I am going to take pictures of them and start deciding if I want to frog or finish them. I have a few that are single socks left over from my test knitting that need to be finished as well as some that I started for myself.

This was just the Fingering weight box. I still have many others to work threw and I know there are more projects to add to the Frog or Finish pile. I first want to work on the commission knitting and the Tunisian Blanket before I really dive into the Frog or Finish idea. I am also still working on the Stash knitting. I have made it through January with out buying yarn or roving. I am happy with myself.

I have also worked on my Pipers Journey Shawl. I have completed the first ball of yarn and I am getting ready to add the second and figure out when I am going to stop with the garter and add the boarder. I believe I am just a few rows from that point, but will do a count and make sure I have enough added to make the boarder even.

I have stared a sweater for myself. I am excited to be working on it. The yarn is from Bendigo Woolen Mills in Australia. It was brought back by a friend who visited another friend over there. When she visited us, she was working on a sweater out of the same yarn and I loved it. I like the sweater, but I don't think I would have finished it since I would have had to knit the cable separate then sew it on. I am not a pieces kind of gal. Though I may want to do it in the future, its in my library. I have chosen to do Vodka Lemonade. A person in my knitting group is also doing this sweater and we have agreed to push each other to get it finished. It is from the top down and I have finished the collar and I have 3" of 11" for the raglan seam done. I am enjoying the knitting on this.
Vodka Lemonade sweater.

I was commissioned last year to knit a pair of socks and mittens for a lady on Rav and she would weave me a scarf. She has mostly finished the scarf, it just needs to be "blocked" and some fringe work. I on the other hand have not touched my projects for her for a bit. Christmas had some thing to do with that. I have vowed to get these finished, which means I will be putting the sweater and other projects down until these are finished.
Cadence Socks

I had also started a pair of socks last year with the hopes to wear them for Halloween. Yeah, that didn't happen. They haven't been touch in forever. I would like to get them finished in the next few months.

I have frogged, or plan on frogging, a few projects too. Or at least plan on doing it. First up is the cowl that I finished, It just isn't right. I will frog this and knit something else up. I frogged a cowl that was being knitted in Lorna's Laces Shepard Sport in the River color way. I just wasn't liking the way the color was turning out on it. I do plan on casting on another cowl, but I am just not there yet. I also had started the Hope Shawlette by Stefanie Japel in Lorna's Laces Soulmate in the Flamingo color way. I just wasn't excited by the way the color was turning out. I am going to frog this and do something else with the color way. It was purchased as "Boobie Month" kit.

Frog it pile. I still have to do the cowl and the shawl.
There has been NO spinning in January. I have been itching to get back to it, but some things have to be finished first and I was not in the mood to spin while I was sick.
Must finish this so I can get started on other stuff.

Project Goals for February:

1. Finish Cadence Sock.
2. Finish 36x36 Mittens. Then packaged and ship 1 & 2 to Commission in Washington DC.
3. Progress on Vodka Lemonade.
4. Progress/Finish? on Tunisian Baby Blanket.
5. Choose yarn and start Afghan Blocks (5 minimum) and plan for the rest of the blanket (I worked out that I would have to complete 5 blocks a month plus 4 others to do the big afghan by the end of this year. I didn't do the blocks for January, so those will be added. It will be 5 blocks for February and 6 blocks a month for the rest of the year.
6. Spin up the roving that is on the wheel and start on some Loop Bumps.
7. Work on some cross-stitching.
8. Purchase and set up the Victory HAED cross-stitch.